
Construction Begins on the Beach Club at Sandy Bank Bay
Tweet
Christophe Harbour Development Company (CHDC) Limited and the Prime Minister of the Federation of St. Kitts and Nevis, Honorable Denzil Douglas announced today that construction of The Beach Club at Sandy Bank Bay is now underway.

Left to Right: Christophe Harbour COO LeGrand Elebash, Gene Budler of DCK, and Prime Minister Denzil Douglas.
The Beach Club is Christophe Harbour’s second private Club amenity following the golf course at Priddie’s Plateau and will serve as a vibrant gathering space for Christophe Harbour Club Members and their guests. The 9,400 square foot open-air venue will include a swimming pool, changing area and covered beach bar and grille. In addition to the pool and lounge areas, the Beach Club will provide direct access to Sandy Bank Bay beach and Atlantic Ocean.
Overlooking the Atlantic, the Beach Club will join the Beach House restaurant as an alternate dining option at Christophe Harbour. The Beach Club, open Tuesday – Sunday year round, will serve a light continental breakfast and lunch.
“The Beach Club groundbreaking signifies another evolution in the continual development of Christophe Harbour,” said LeGrand Elebash, Chief Operating Officer , CHDC. “The Sandy Bank Bay community is growing rapidly, and this venue will be stylish, comfortable, and convenient for our members and guests. It will be the cornerstone of Sandy Bank Bay in the future.”
The Beach Club at Sandy Bank Bay is expected to open in early 2011 with approximately 12 staff members consisting of beach, pool and changing area attendants as well as a food and beverage team.

Designed by John Denton Haley, Director of Architecture for CHDC, The Beach Club will have coral floors and columns as well as stone and Wallaba wood roof shingles. The Beach Club’s architecture begins with an open structure taken from St. Kitts- Nevis inspiration and defined by romantic pathway entrances, stone arches, fireplaces, private dining patios, natural-edged pools, and waterfall showers.
DCK Worldwide, a global construction company that specializes in high-end hospitality development, will build the $7 million complex. Having worked in the Caribbean for 15 years developing more than 80 projects, DCK Worldwide will serve as the general contractor operating from its St. Kitts office. It is now reviewing bids to hire local sub-contractors that will perform specialized trade work throughout the project.
“As Christophe Harbour continues to progress, we are coming closer to realizing the goal of elevating St. Kitts as a well recognized travel and lifestyle destination,” said the Honorable Denzil Douglas. “And by building The Beach Club at Sandy Bank Bay, the Christophe Harbour development team is making still another important contribution to the future of the southeast peninsula and our Federation.”





Comments
Evan Nisbett posted at 11:07 pm on August 6th, 2010
When will the construction actually start? What is the estimated completion time? Which construction company will be doing the construction of this Beach Club? What are the main materials that the Beach Club would be constructed from?
Katherine Verano posted at 11:07 pm on August 6th, 2010
Construction is underway with DCK Worldwide, as we speak. The Beach Club should open in early 2011 and will have coral floors and columns as well as stone and wood roof shingles.
mike vitti posted at 11:07 pm on November 11th, 2010
hello i am looking into seeing if there is a call for a US plumber i have been in the trade for almost 9 years. I would like to know any information on work there. My girlfriend is currently attending school on the island and i have no work in the states please get back to me with any info. thank you very much
mike vitti
Darrell posted at 11:07 pm on March 5th, 2011
What is the status of the Turtle Beach Bungalows during construction?
Thank you.